Eldorado Park was built in 1991, and was opened in March 1992 with 7 staff members (2 Librarians, 4 Library Assistants, and 1 General Assistant). When the library had limited facilities for the communities, and these were extended later as the library was renovated. The library is now a two-story building, with the main library on the ground floor, the office on the 1st floor. The first floor used to be a study area. In June 2016, the opening between the first floor and the ground floor was closed off, and the first-floor space was converted into an eLearning classroom for digital literacy activities.
Eldorado Park Ext. 5 Library
